T2ue was able to provide accurate utility location data and identify conflicts to ensure the streetcar project was designed and delivered within budget and the tight construction schedule.

The City of Charlotte’s streetcar project is a key component of the City’s area transit system, designed to serve Charlotte’s central business district and provide connectivity to surrounding communities.

Previously, projects that presented utility conflicts had resulted in significant unbudgeted construction costs for the City, along with unexpected project delays. With that in mind, the City sought a dependable Subsurface Utility Engineering provider for the streetcar project to pre-empt and plan for any such issues. The City engaged T2ue to undertake this critical work based on our strong track record in the field and reputation as an industry leader.

T2ue selection was also based on our staffing resources and expertise to complete the Subsurface Utility Engineering work on a fast-tracked schedule. Our team mobilized accordingly, using up to six field crews simultaneously to complete the necessary fieldwork.

We provided designating (CI/ASCE 38-02 Quality Level B) SUE services to map the horizontal position of underground utilities within the proposed 10-mile corridor for a streetcar track.

Due to the high number of potential conflicts posed by the unique catenary system that would power the streetcar, we also identified all overhead utilities.

At the City’s request, we located portions of an abandoned, early 1900s rail system that had been paved over along the project corridor. This was beneficial to the design team in determining the final location of the new rail system. Our team also analyzed potential utility conflicts, which enabled the designer to resolve possible issues prior to construction.